Image
image
image
image



Other Fees

Account Deposits

Not Applicable

Late Payment Penalty

Un-paid balance up to $133.00

$ 2.00 / month

Un-paid balance over $133.00

1.5% of cumulative balance / month

Recording Fee (Charlotte & Sarasota Counties)

1st Page

$ 10.00

Additional Pages

$ 8.50 / each

Returned Check (any reason)

$30.00 or 5% of Check (whichever is greater)

Internet or On-Line Item Return

$ 5.00

Usage Report (non-customer)

$ 0.25/per account - Minimum $5.00

Additional Meter (after CCC)

Actual Cost

Temporary Water Meter (Construction etc.)

Meter Deposit

$ 500.00

Rental

$ 15.62/month

Usage

See Water Rates

Relocation

$ 25.00 / each

Tap Line

$ 500.00 - Administration

Construction Cost (line extension etc.)

Paid by Applicant

Fire Line (no CCC)

Administration

$ 500.00

Base Facility Charge (line diameter)

Up to 8" $ 15.00 / month

Greater than 8" up to 12" $ 20.00 / month

Greater than 12" $ 25.00 / month

Construction (line extension etc.)

Paid by Applicant

Tampering

$ 500.00 (maximum)

Replace Locking Device

$ 50.00

Locking Device

$ 10.00

Chain & Locking Device

$ 15.00

Research & Copies

One-sided copy

$ 0.15/page

Two-sided copy

$ 0.20/page

Minutes (uncertified)

$ 0.15/page

Minutes (certified)

$ 1.00/page

Research &/or Monitoring

$ 20.00/hour - 1-hour Minimum

Maps

$ 1.00/sheet

Blue Prints

$ 1.00/page

AutoCad Disc

$ 5.00/each

Fax Request

$ 1.00/page

Plan Review

$ 10.00/sheet

Labels & Computer Time

$ 30.00 + $15.00 hour

Bid Documents

As advertised

Turn On / Turn Off

48-hour written notice required

once each year - No Charge

Additional service with 48-hour notice

$ 15.00 each trip

Evenings and/or weekends

$ 50.00 / trip

Without 48-hour notice

$ 30.00 / trip

Evenings & weekends

$ 50.00 / trip

Holidays

$ 150.00 / trip

Account Re-Activation

Lock Removal

$ 20.00 / trip (on and off)

During Working Hours

$ 20.00 / trip

After Working Hours

$ 75.00 / trip

Holidays

$ 225.00 / trip

Administrative Account Re-activation

$ 60.00

Meter Re-installation

During Working Hours

$ 60.00

After Working Hours

$ 100.00

Holidays

$ 200.00

New Meter (if applicable)

Actual Cost

Payment Deadline Extension (after processing)

$ 10.00/occurrance

Service Call-outs

During working hours

$ 30.00 / trip

After Working Hours

$ 50.00 / trip

Holidays

$ 150.00 / trip

Sewer Repair (unoccupied property)

Actual Cost

Meter Test (within tolerance)

5/8" meter

$ 40.00

1" or 1.5" meter

$ 50.00

Backflow Testing by EWD

$ 100.00

Sewer Cap/Uncap Charge

$ 30,00 / each occurrence

Air Intage Repair

$ 100.00

Special Bill / Meter Read

$ 30.00 each

Testing & Inspections

Fire Flow Test(uncertified)

$ 175.00

Bacteriological Test

$ 40.00 each

Wastewater Tie-in Inspection (initial)

No Charge

Additional Tie-in Reinspection

$ 30.00

Wastewater Service Locate (initial)

No Charge

Additional Locate

$ 30.00

Large Meter Installation

$ 50.00

Large Meter Reinspection

$ 25.00

Financing Terms (CCC)

Interest

5%

Term

15 years

Down Payment

None

Meter Installation (Initial)

Standard Service & Box provided by EWD

5/8" meter

$ 380.00 (with or without DC backflow)

1"

$ 605.00

1.5"

$ 765.00

2"

$ 903.00

Service & Box provided by Developer

5/8" meter

$ 300.00 (with or without DC backflow)

1"

$ 300.00

1.5"

$ 400.00

2"

$ 500.00

3" & Larger

Purchase & installation by Customer

Obstructed Meter Clearing

Actual Cost - Minimum $25.00

 



image
image
image